Pilot House
The main breaker panel is almost completed, which implies most of the wiring is probably done. Windows are in and the settee is built out.
Day head sink is in. Still no tile on the floor, port light in the window or toilet.
Another shot of the day head.
This shot clearly shows where the finished work work is covered with bubble wrap for protection.
The helm. When Blossom is commissioned, those white gaps above and below the windows will be covered with dials, gauges and screens.
A shot of the settee. 55/60 aficionados will detect the slight widening of the seat by the commensurate narrowing of the foot landing. Just a few inches in seat depth can make all the difference in comfort.
Even the seat base boards have matching wood grain.
Tea Station (aka Captains Cabin)
Looking aft over the settee. The granite is in and they've started to prep for the wall covering.
View of the bed. Wide enough for a single, it's now more of a couch.
The Miele Speed Oven (microwave/convection combination)
Looking forward, the Vitrofrigo drawer fridge is in. Flush handles allow the drawers under the bed to open. Two drawers and a locker for supplies.
This shot, looking starboard, shows that there's going to be plenty of room to make tea :-)
Salon
Looking aft we can see that the windows are in, walls are prepped and the starboard aft cabinets are built. There was a lot of discussion about the difference in width between the upper and lower cabinets. Turned out OK. Scott - you were right. Again. :-)
Looking forward. We finally see what our changes have wrought and we're very happy!
Portside. Ready for the couch.
Starboard. Two Ekornes chairs and a table between them.
Stairs up to the pilot house. A sliding drawer under here for more storage. Note the notch in the wall to the left of the stairs? Another tweak to improve the open feeling. The stairs heading down to the utility room aren't quite so dark.
Galley
Tiled floor going in. So far the only appliance installed is the fridge/freezer. I presume the rest will go in after the tiling is finished.
Another shot of the floor. I really like the look. Great job Scott and Steph!
Counter top showing the fiddles protecting the wood around the stack. Backsplash tiles still to go in.
The locker on the left is called the "Spice Rack" by Nordhavn. We're going to rename it the "Sodastream cubby"
We really gained a lot of storage by not installing a microwave in the forward cabinets. Not needed as the oven will be another Miele Speed Oven. The cooktop is going to be induction. The angled corner cabinet is large enough to hold a full dinner service.
I'm hoping that the yard will be swapping the bucket for a trash compacter :-)
Master Stateroom and head
Looking good! Anyone notice the projector box?
The valance will hide the screen for the projector
A large mirror should help open the space out.
Close up of the projector box.
Sink in the master head. The counter top looks massive!
Nearly ready for the wall covering
Master shower is tiled and hardware is going in.
Tiled. Note the extra two drains foward? If Blossom is ever a little bow heavy, the shower will still drain.
VIP Stateroom and head
Looking forward. Some wall covering, a few doors and drawers (which have already been built) and this room will be done.
Steph's sewing table. Note the cutout for the sewing machine. The locker on the right is storage for the machine.
We widened the guest bed as much as we could. Note the small shelf outboard that will act as an end table.
Not much in the way of inset panels in this stateroom. The locker doors and drawers have the only panels.
The extra port light and the wall covering will really brighten up this room.
Steph is really happy with the natural light over her workspace.
Nearly done. Just the backsplash to go.
Shower locker
Seat and another locker in the shower.
More storage under the stairs between the guest stateroom and the pilot house.
Cockpit
The salon dutch door is installed - windows upper and lower. I'm happy to see that the davit standpipe is very stealth. Find it if you can!
It's a little obscured by a cover, but you can just make out the stern capstan hiding inside the cockpit seating. Look through the hole on the right!
Boat Deck
Not sure what I'm seeing here. This is the walkway beside the pilot house on the port side. Vent exhausts, perhaps?
Davit is installed and they've started to install the rails.
No ladder to the flybridge either. Hopefully it'll be added soon after the rails.
Utility Room
I'm not seeing much change in the utility room, though it's pretty much finished.
Bilge pump?
The custom locker is looking good. A nice place to store ear defenders and engine room checklists.
Engine Room
Nice shot of the main engine
The bank of valves is the send manifold.
The fuel return manifold
Wing engine
This space will end up being used for storage.
The hydraulics have been fully plumbed. This is the remaining valves and sensors needed that the monobloc couldn't hold.
Generator on the right, wing on the left.
Main transmission and clutched hydraulic PTO
Lazerette
Machinery getting installed.
Battery switches on the left. Battery box straight ahead.
There's a dive compressor under all that cardboard.
It looks like the watermaker has been installed.